Joint Implementation Projects


Joint Implementation Project (JI Project) is an investment project that is implemented in compliance with Article 6 of the Kyoto protocol.

The procedures of approval and implementation of JI Projects are defined in the Governmental regulation of the Russian Federation of October, 28-th, 2009 N 843 on the order of the Article 6 projects implementation approval and control.

Decisions adopted on the 7th Conference of the Parties in Morocco in 2001 contain the guidelines for JI Projects. The procedure of JI Projects implementation is described in "Guidelines for the implementation of Article 6 of the Kyoto Protocol" (decision 9/CMP.1) that was adopted in Montreal in 2005.

In accordance with the Article 46 of 13/CMP.1 UNFCCC Decision the following information concerning JI projects is published on this website:

RU1000200

  • a) Project name: Yety-Purovskoe Oil Field Associated Gas Recovery and Utilization Project

  • b) Project location: Yamal-Nenets Autonomic district.

  • c) Years of ERU issuance: 2011, 2012.

  • d) Reports: PDD (in Russian); RF Letter of approval (in Rusian); Letter of approval of Japan; Expert Statement (Determination report); Verification report for the period 01.08.2009 - 31.12.2009; Monitoring report for 01.01.2010-31.12.2010; Verification report for 01.01.2010-31.12.2010; Verification expert evaluation for 01.01.2010-31.12.2010 (in Russian and English); Monitoring report for 01.01.2012-31.03.2012; Verification expert evaluation for 01.01.2012-31.03.2012 (in Russian). Monitoring report for 01.04.2012-30.09.2012 (in Russian); Verification expert evaluation for 01.04.2012-30.09.2012 (in Russian).

    RU1000201

  • a) Project name: Co-destruction of HFC23 and SF6 at KCKK Polimer plant

  • b) Project location: Kirovo-Chepetsk.

  • c) Years of ERU issuance: 2010, 2011, 2012.

  • d) Reports: PDD; Determination protocol on the revised monitoring plan; Expert statement; RF Letter of approval (in Russian); Switzerland Letter of approval; Expert Statement; Monitoring report for 2010 (in Russian); Verification expert evaluation for 2008 (in Russian); Verification expert evaluation for 2009 (in Russian); Verification expert evaluation for 9 months 2010 (in Russian); Verification expert evaluation for 2010 (in Russian); Monitoring report for 01.01.2011 - 31.03.2011; Verification expert evaluation for 01.01.2011 - 31.03.2011 (in Russian); Monitoring report for 01.04.2011 - 30.06.2011; Verification expert evaluation for 01.04.2011 - 30.06.2011 (in Russian); Monitoring report for 01.07.2011 - 30.09.2011; Verification expert evaluation for 01.07.2011 - 30.09.2011 (in Russian); Monitoring report for 01.10.2011-31.12.2011; Verification expert evaluation for 01.10.2011-31.12.2011 (in Russian); Monitoring report for 01.01.2012 - 31.03.2012; Verification expert evaluation for 01.01.2012 - 31.03.2012 (in Russian); Monitoring report for 01.04.2012 - 30.06.2012; Verification expert evaluation for 01.04.2012 - 30.06.2012(in Russian). Monitoring report for 01.07.2012 - 30.09.2012; Verification expert evaluation for 01.07.2012 - 30.09.2012 (in Russian); Monitoring report for 01.10.2012 - 31.10.2012; Verification expert evaluation for 01.10.2012 - 31.10.2012 (in Russian); Monitoring report for 01.11.2012 - 30.11.2012; Verification expert evaluation for 01.11.2012 - 30.11.2012 (in Russian).

    RU1000202

  • a) Project name: HFC-23 destruction at JSC, Halogen.

  • b) Project location: Perm.

  • c) Years of ERU issuance: 2010, 2011, 2012.

  • d) Reports: PDD; Determination protocol on the revised monitoring plan; RF Letter of approval (in Russian); Switzerland Letter of approval; Expert Statement; Monitoring report for 2010 (in Russian); Verification expert evaluation for 2008 (in Russian); Verification expert evaluation for 2009 (in Russian); Verification expert evaluation for 9 months 2010 (in Russian); Verification expert evaluation for 2010 (in Russian); Monitoring report 01.04.2011 - 30.06.2011; Verification expert evaluation for 01.04.2011 - 30.06.2011 (in Russian); Monitoring report for 01.07.2011 - 30.09.2011; Verification expert evaluation for 01.07.2011 - 30.09.2011 (in Russian); Monitoring report for 01.10.2011-31.12.2011; Verification expert evaluation for 01.10.2011-31.12.2011(in Russian). Monitoring report for 01.01.2012 - 31.03.2012; Verification expert evaluation for 01.01.2012 - 31.03.2012(in Russian); Monitoring report for 01.04.2012 - 30.06.2012; Verification expert evaluation for 01.04.2012 - 30.06.2012 (in Russian). Monitoring report for 01.07.2012 - 30.09.2012; ?Verification expert evaluation for 01.07.2012 - 30.09.2012 (in Russian); Monitoring report for 01.10.2012 - 31.10.2012; Verification expert evaluation for 01.10.2012 - 31.10.2012 (in Russian); Monitoring report for 01.11.2012-30.11.2012; Verification expert evaluation for 01.11.2012-30.11.2012 (in Russian).

    RU1000227

  • a) Project name: Evaporation System Modernization at OJSC "Ilim Group" Branch in Koryazhma.

  • b) Project location: Town of Koryazhma, Arkhangelsk Region, Russia.

  • c) Years of ERU issuance: 2011, 2012.

  • d) Reports: PDD; RF Letter of approval (in Russian) ; Letter of approval of France (In French and English); Determination report; Monitoring report 2008 - 2009; Verification report 2008 - 2009; Monitoring report 2010 (in Russian); Verification report 2010 (in Russian); Monitoring report 01.01.2011-30.09.2012 (in Russian); Verification report 01.01.2011-30.09.2012 (in Russian).

    RU1000228

  • a) Project name: Implementation of arc-furnace steelmaking at Magnitogorsk Iron and Steel Works.

  • b) Project location: Magnitogorsk, Chelyabinsk Region, Russia.

  • c) Years of ERU issuance: 2011, 2012.

  • d) Reports: PDD; RF Letter of approval (in Russian and English) ; Letter of approval of Netherland (In English and Russian); Determination report; Monitoring report for 01.01.2008-31.12.2009; Monitoring report for 01.01.2010-31.12.2010; Verification report for 01.01.2008-31.12.2009; Verification report for 01.01.2010-31.12.2010; Monitoring report for 01.01.2011-31.12.2011 (in Russian); Verification report for 01.01.2011-31.12.2011; Verification expert evaluation for 01.01.2011-31.12.2011 (in Russian); Report:Monitoring report for 01.01.2012-30.09.2012, Verification report for 01.01.2012-30.09.2012 (in Russian).

    RU1000229

  • a) Project name: Associated Petroleum Gas Recovery for the Kharampur oil fields of "Rosneft".

  • b) Project location: Krasnoselkupsky and Purovsky Municipal Districts, Yamalo-Nenetsky Autonomous District, Tumen Region.

  • c) Years of ERU issuance: 2013.

  • d) Reports: PDD; RF Letter of approval (in Russian and English); Letter of approval of Netherland (in English and Russian); Determination report; Monitoring report for 13.09.2012-31.10.2012 (in Russian); Verification expert evaluation for 13.09.2012-31.10.2012 (in Russian).

    RU1000230

  • a) Project name: Associated Gas Recovery Project for the Komsomolskoye Oil Field.

  • b) Project location: Gubkinskiy city, Tumen Oblast,Yamal-Nenets Autonomous Okrug, Russia.

  • c) Years of ERU issuance: 2012, 2013.

  • d) Reports: PDD; RF Letter of approval (in Russian); Belgium Letter of approval; Ireland Letter of approval; Luxemburg Letter of approval; Portugal Letter of approval; Norway Letter of approval; Denmark Letters of approval; Italy Letters of approval; Spain Letters of approval; Determination report (in English and Russian); Monitoring report for 01.12.2011-29.02.2012 (in Russian); Verification expert evaluation for 01.12.2011-29.02.2012 (in Russian); Monitoring report for 01.03.2012-31.12.2012 (in Russian); Verification expert evaluation for 01.03.2012-31.12.2012 (in Russian).

    RU1000231

  • a) Project name: Reduction of perfluorocarbons emissions from RUSAL Krasnoyarsk Aluminium Smelter.

  • b) Project location: Krasnoyarsk, Krasnoyarsky kray, Russia.

  • c) Years of ERU issuance: 2011, 2012.

  • d) Reports: PDD; RF Letter of approval (in Russian and English) ; Letter of approval of Netherland (In English and Russian); Expert statement (In English and Russian); Monitoring report for 01.01.2008-31.12.2009; Monitoring report for 01.01.2010-31.12.2010; Verification report for 01.01.2008-31.12.2009; Verification report for 01.01.2010-31.12.2010; Changes in PDD (in Russian); Expert statement on changes in PDD (in Russian); Monitoring report for 01.01.2011 - 31.10.2011 (in Russian); Verification expert evaluation for 01.01.2011 - 31.10.2011 (in Russian); Monitoring report for 01.11.2011 - 30.06.2012 (in Russian); Verification expert evaluation for 01.11.2011 - 30.06.2012 (in Russian).

    RU1000232

  • a) Project name: Installation of CCGT-400 at Shaturskaya TPP, OGK-4.

  • b) Project location: Shatura town, east of Moscow area, Russia.

  • c) Years of ERU issuance: 2011, 2012.

  • d) Reports: PDD; RF Letter of approval (in English and Russian ); Letter of approval of Germany (In German and English); Determination report; Monitoring report for 24.09.2010 - 31.12.2010 (in Russian); Verification report for 24.09.2010 - 31.12.2010 (in Russian); Monitoring report for 01.01.2011-31.12.2011 (in Russian); Verification expert evaluation for 01.01.2011-31.12.2011 (in Russian).

    RU1000233

  • a) Project name: Biomass wastes to energy at OJSC “Ilim Group” Branch in the town of Bratsk.

  • b) Project location: The town of Bratsk , Irkutsk Region, Russia.

  • c) Years of ERU issuance: 2011, 2012.

  • d) Reports: PDD; RF Letter of approval (Russian ); Letter of approval of France (In French and English); Determination report; Monitoring report for 01.01.2008-31.12.2009; Verification report for 01.01.2008-31.12.2009; Monitoring report for 01.01.2010-31.12.2010 (in Russian); Verification report for 01.01.2010-31.12.2010 (in Russian); Monitoring report for 01.01.2011-30.09.2012 (in Russian); Verification expert evaluation for 01.01.2011-30.09.2012 (in Russian).

    RU1000238

  • a) Project name: Reconstruction of the steelmaking at JSC “Ashinskiy Metallurgical Works”.

  • b) Project location: Asha, Chelyabinsk Region, Russia.

  • c) Years of ERU issuance: 2011, 2012.

  • d)Reports: PDD; RF Letter of approval (in Russian) ; Switzerland Letter of approval; Determination report; Monitoring report for 01.01.2008-31.12.2010; Verification expert evaluation for 01.01.2008-31.12.2010 (in Russian); Monitoring report for 01.01.2011-31.12.2011 (in Russian); Verification expert evaluation for 01.01.2011-31.12.2011 (in Russian); Monitoring report for 01.01.2012-30.09.2012 (in Russian); Verification expert evaluation for 01.01.2012-30.09.2012 (in Russian).

    RU1000239

  • a) Project name: SNG gas gathering.

  • b) Project location: 15 km from Nizhnevartovsk city, West Siberia, Khanty-Manskiysky Autonomous Okrug, Russia.

  • c) Years of ERU issuance: 2011, 2012.

  • d) Reports: PDD; RF Letter of approval (in Russian); France Letter of approval (in English and French); Determination report; Monitoring report for 01.04.2009-31.12.2009; Verification expert evaluation for 01.04.2009-31.12.2009 (in Russian); Monitoring report for 01.01.2010-31.12.2010 (in Russian); Verification expert evaluation for 01.01.2010-31.12.2010 (in Russian); Monitoring report for 01.01.2011-31.12.2011 (in Russian); Verification expert evaluation for 01.01.2011-31.12.2011 (in Russian).

    RU1000240

  • a) Project name: Upgrading of technological tube furnaces at the company “LUKOIL-Permnefteorgsintez” LLC, city of Perm, Russian Federation

  • b) Project location: Perm city, Perm Krai, Russian Federation

  • c) Years of ERU issuance: 2012.

  • d) Reports: PDD; RF Letter of approval (in Russian and English); Great Britain Letter of approval (in English and Russian); Determination report; Monitoring report for 01.01.2008-31.12.2010 (in Russian); Verification expert evaluation for 01.01.2008-31.12.2010 (in Russian).

    RU1000261

  • a) Project name: Coal- to-Waste Wood Energy Switch in Town of Onega.

  • b) Project location: Onega town, Arkhangelsk Region, North- West Russia.

  • c) Years of ERU issuance: 2012.

  • d) Reports: PDD; RF Letter of approval (in Russian); Great Britain Letter of approval (in Russian and English); Determination report; Monitoring report for 01.01.2008-31.12.2008 (in Russian); Verification expert evaluation for 01.01.2008-31.12.2008; Monitoring report for 01.01.2009-31.12.2009 (in Russian); Monitoring report for 01.01.2010-31.12.2010 (in Russian); Verification expert evaluation for 01.01.2009-31.12.2010.

    RU1000263

  • a) Project name: Implementation of energy efficiency projects at OJSC “Novolipetsk Steel”, Lipetsk area, Russia.

  • b) Project location: Lipetsk town in the Lipetsk area of the Russian Federation.

  • c) Years of ERU issuance: 2012.

  • d) Reports: PDD; RF Letter of approval (in Russian and English); Netherland Letter of approval (in English and Russian); Determination report (in English and Russian); Monitoring report for 01.01.2008-31.12.2010 (in Russian); Verification statement for 01.01.2008-31.12.2010.

    RU1000268

  • a) Project name: Biomass utilization at JSC Segezha Pulp and Paper Mill.

  • b) Project location: The town of Segezha, the Republic of Karelia, North-West of Russia.

  • c) Years of ERU issuance: 2012.

  • d) Reports: PDD; RF Letter of approval (in Russian); Great Britain Letter of approval (in English and Russian); Determination report (in Russian); Monitoring report for 01.01.2008-31.12.2010; Verification statement for 01.01.2008-31.12.2010 (in Russian); Verification report for 01.01.2008-31.12.2010.

    RU1000270

  • a) Project name: Wood waste to energy in Severoonezhsk, the Arkhangelsk Region

  • b) Project location: Severoonezhsk settlement, the Plesetsk District, the Arkhangelsk Region, Russia.

  • c) Years of ERU issuance: 2011, 2012.

  • d) Reports: PDD; RF Letter of approval (in Russian and English) ; United Kingdom Letter of approval; Determination report; Monitoring report for 01.08.2008 - 31.12.2009; Verification report for 01.08.2008 - 31.12.2009; Monitoring report for 01.01.2010-31.12.2010 (in Russian); Verification statement for 01.01.2010 - 31.12.2010 (in Russian); Monitoring report for 01.01.2011 - 31.12.2011 (in Russian); Verification statement for 01.01.2011 - 31.12.2011 (in Russian); Monitoring report for 01.01.2012 - 31.10.2012 (in Russian); Verification statement for 01.01.2012 - 31.10.2012 (in Russian).

    RU1000276

  • a) Project name: Utilization of associated petroleum gas (APG) at the Serginskoye oil field

  • b) Project location: Serginskoye county, Okt’abrsky area, Khanty-Mansijsk Okrug- Yugra, Tyumen oblast, Western Siberia, Russia.

  • c) Years of ERU issuance: 2011, 2012, 2013.

  • d) Reports: PDD (in Russian); RF Letter of approval (in Russian and English) ; Switserland Letter of approval (in English and Russian); Determination report; Monitoring report for 06.04.2009 - 31.12.2010 (in Russian); Verification expert evaluation for 06.04.2009 - 31.12.2010 (in Russian); Monitoring report for 01.01.2011 - 31.12.2011 (in Russian); Verification expert evaluation for 01.01.2011 - 31.12.2011 (in Russian); Monitoring report for 01.01.2012-31.10.2012; Verification expert evaluation for 01.01.2012-31.10.2012 (in Russian); Monitoring report for 01.11.2012-31.12.2012 (in Russian); Verification expert evaluation for 01.11.2012-31.12.2012 (in Russian).

    RU1000277

  • a) Project name: Utilization of Associated petroleum gas (APG) at the Vostochno-Perevalnoye oil field.

  • b) Project location: Russkinskoye county, Surgutsky area, Khanty-Mansijsky Okrug - Yugra, Tumen oblast, Western Siberia, Russia .

  • c) Years of ERU issuance: 2011, 2012, 2013.

  • d) Reports: PDD; RF Letter of approval (in Russian) ; Switserland Letter of approval (in English and Russian); Determination report; Monitoring report for 01.01.2008 - 31.12.2009 (in Russian); Verification expert evaluation for 01.01.2008 - 31.12.2009 (in Russian); Verification expert evaluation for 01.01.2010 - 31.12.2010 (in Russian); Monitoring report for 01.01.2011 - 31.12.2011 (in Russian); Verification expert evaluation for 01.01.2011 - 31.12.2011 (in Russian); Monitoring report for 01.01.2012-31.10.2012; Verification expert evaluation for 01.01.2012-31.10.2012 (in Russian); Monitoring report for 01.11.2012-31.12.2012 (in Russian); Verification expert evaluation for 01.11.2012-31.12.2012 (in Russian).

    RU1000278

  • a) Project name: Utilization of associated petroleum gas (APG) at the Sredne-Khulymsk oil field.

  • b) Project location: Nadym district, Yamalo-Nenetzky autonomous okrug (YaNAO), Tumen oblast, Western Siberia, Russia.

  • c) Years of ERU issuance: 2011, 2012, 2013.

  • d) Reports: PDD; RF Letter of approval (in Russian); Switserland Letter of approval (in English and Russian); Determination report; Monitoring report for 01.01.2008-31.12.2009 (in Russian); Verification expert evaluation for 01.01.2008-31.12.2009 (in Russian); Verification expert evaluation for 01.01.2010-31.12.2010 (in Russian); Monitoring report for 01.01.2011-31.12.2011 (in Russian); Verification expert evaluation for 01.01.2011-31.12.2011 (in Russian); Monitoring report for 01.01.2012-31.10.2012; Verification expert evaluation for 01.01.2012-31.10.2012 (in Russian); Monitoring report for 01.11.2012-31.12.2012 (in Russian); Verification expert evaluation for 01.11.2012-31.12.2012 (in Russian).

    RU1000281

  • a) Project name: Modernization of Steel Production at Seversky Pipe Plant, Sverdlovsk Region, Russia.

  • b) Project location: Polevskoy town, Sverdlovsk Region, Russian Federation.

  • c) Years of ERU issuance: 2012.

  • d) Reports: PDD (in Russian); RF Letter of approval (in English and Russian); Switzerland Letter of approval(in Russian); Determination report (in Russian); Monitoring report for 01.01.2009-31.12.2009 (in Russian); Monitoring report for 01.01.2010-31.12.2010 (in Russian); Verification expert evaluation for 01.01.2009 - 31.12.2009 (in Russian); Verification expert evaluation for 01.01.2010 - 31.12.2010 (in Russian); Monitoring report for 01.01.2011 - 31.07.2012 (in Russian); Verification expert evaluation for 01.01.2011 - 31.07.2012 (in Russian).

    RU1000282

  • a) Project name: Implementation of resource-saving technologies at JSC “Ural Steel”, Novotroitsk, Russia

  • b) ìProject location: Novotroitsk, Orenburg region, Russia

  • c) ãYears of ERU issuance: 2012.

  • d) Reports: PDD (in Russian); RF Letter of approval (in Russian); Switzerland Letter of approval (in English and Russian); Determination report; Monitoring report for 01.06.2008 - 31.12.2008 (in Russian); Verification expert evaluation for 01.06.2008 - 31.12.2008 (in Russian); Monitoring report for 01.01.2009 - 31.12.2009 (in Russian); Verification expert evaluation for 01.01.2009 - 31.12.2009 (in Russian).

    RU1000300

  • a) Project name: Reconstruction of the OJSC “Nizhniy Tagil Iron and Steel Works” blast furnaces #5 and #6

  • b) ìProject location: Nizhniy Tagil city,Sverdlovsk region, Russia

  • c) ãYears of ERU issuance: 2012.

  • d) Reports: PDD; RF Letter of approval (in Russian); Switzerland Letter of approval (in English); Determination report; Monitoring report for 01.01.2008 - 31.12.2009 (in Russian); Verification expert evaluation for 01.01.2008 - 31.12.2009 (in Russian); Monitoring report for 01.01.2010 - 31.12.2010 (in Russian); Verification expert evaluation for 01.01.2010 - 31.12.2010 (in Russian); Monitoring report for 01.01.2011 - 31.12.2011 (in Russian); Verification expert evaluation for 01.01.2011 - 31.12.2011 (in Russian).

    RU1000302

  • a) Project name: Utilisation of CMM on coal mines of OAO “SUEK-Kuzbass”.

  • b) Project location: Kemerovo Oblast, Russian Federation.

  • c) Years of ERU issuance: 2012.

  • d) Reports: PDD (in Russian); RF Letter of approval (in Russian); Switzerland Letter of approval(in English and Russian); Determination report (in Russian and English); Monitoring report for 01.01.2009-30.09.2011 (in Russian); Verification expert evaluation for 01.01.2009 - 30.09.2011 (in Russian).

    RU1000304

  • a) Project name: Yuzhno Balyksky associated gas recovery project.

  • b) Project location: Pyt-Yakh , Khanti-Mansiyskiy Autonomous District, Russia.

  • c) Years of ERU issuance: 2012.

  • d) Reports: PDD; RF Letter of approval (in Russian); RF Letter of approval (in English and Russian); Great Britain Letter of approval (in English and Russian); Determination report; Monitoring report for 04.11.2009-31.05.2010 (in Russian); Verification expert evaluation for 04.11.2009 - 31.12.2009 (in English and Russian); Verification expert evaluation for 01.01.2010 - 31.05.2010 (in English and Russian); Monitoring report for 01.06.2010-31.12.2011; Verification expert evaluation for 01.06.2010-31.12.2011 (in Russian); Monitoring report for 01.01.2012-24.10.2012; Verification expert evaluation for 01.01.2012-24.10.2012 (in Russian).

    RU1000306

  • a) Project name: Increase in efficiency of water resources use at Bratsk HPP, Irkutsk region, Russian Federation

  • b) Project location: Bratsk City, Irkutsk region, Russian Federation

  • c) Years of ERU issuance: 2012.

  • d) Reports: PDD; ïRF Letter of approval (in Russian); Great Britain Letter of approval ; Determination report; Monitoring report for 01.01.2008-31.12.2008 (in Russian); Verification expert evaluation for 01.01.2008-31.12.2008 (in Russian); Monitoring report for 01.01.2009-31.12.2009 (in Russian); Verification expert evaluation for 01.01.2009-31.12.2009 (in Russian); Monitoring report for 01.01.2010-31.12.2010 (in Russian); Verification expert evaluation for 01.01.2010-31.12.2010 (in Russian); Monitoring report for 01.01.2011-31.12.2011 (in Russian); Verification expert evaluation for 01.01.2011-31.12.2011 (in Russian); Monitoring report for 01.01.2012-31.10.2012 (in Russian); Verification expert evaluation for 01.01.2012-31.10.2012 (in Russian).

    RU1000309

  • a) Project name: SF6 destruction at JSC “HaloPolymer Perm”.

  • b) Project location: Russian Federation, Perm Krai, city of Perm.

  • c) Years of ERU issuance: 2012.

  • d) Reports: PDD; RF Letter of approval (in Russian); Switzerland Letter of approval; Determination report; Expert statement (in Russian); Monitoring report for 01.01.2008-31.12.2008; Verification expert evaluation for 01.01.2008-31.12.2008 (in Russian); Monitoring report for 01.01.2009-31.12.2009; Verification expert evaluation for 01.01.2009-31.12.2009 (in Russian); Monitoring report for 01.01.2010-31.12.2010; Verification expert evaluation for 01.01.2010-31.12.2010 (in Russian); Monitoring report for 01.01.2011-30.09.2011; Verification expert evaluation for 01.01.2011-30.09.2011 (in Russian); Monitoring report for 01.10.2011-31.12.2011; Verification expert evaluation for 01.10.2011-31.12.2011 (in Russian); Monitoring report for 01.01.2012-31.03.2012; Verification expert evaluation for 01.01.2012-31.03.2012 (in Russian); Monitoring report for 01.04.2012 - 30.06.2012; Verification expert evaluation for 01.04.2012 - 30.06.2012(in Russian); Monitoring report for 01.07.2012-30.09.2012; Verification expert evaluation for 01.07.2012-30.09.2012 (in Russian); Monitoring report for 01.10.2012 - 31.10.2012; Verification expert evaluation for 01.10.2012 - 31.10.2012 (in Russian); Monitoring report for 01.11.2012 - 30.11.2012; Verification expert evaluation for 01.11.2012 - 30.11.2012 (in Russian).

    RU1000310

  • a) Project name: Construction of gas turbine power plants for utilization of associated petroleum gas at thirteen oilfields developed by OJSC “Surgutneftegas” in Khanty-Mansiysk Autonomous Okrug, Russian Federation

  • b) Project location: The Russian Federation, Tyumen Region, Khanty-Mansiysk Autonomous Okrug, Surgut city

  • c) Years of ERU issuance: 2012, 2013.

  • d) Reports: PDD; RF Letter of approval (in Russian); Great Britain Letter of approval (in English and Russian); Determination report (in Russian); Monitoring report for 01.01.2008-31.12.2010 (in Russian); Verification expert evaluation for 01.01.2008-31.12.2010 (in Russian); Monitoring report for 01.01.2011-30.04.2012 (in Russian); Verification expert evaluation for 01.01.2011-30.04.2012 (in Russian); Monitoring report for 01.05.2012-31.12.2012 (in Russian); Verification expert evaluation for 01.05.2012-31.12.2012 (in Russian).

    RU1000311

  • a) Project name: Construction and implementation of the Casting and Rolling Complex for the production of hot rolled flat products in the Vyksa District, the Nizhny Novgorod Region, the Russian Federation

  • b) Project location: Vyksa District, the Nizhny Novgorod Region, the Russian Federation

  • c) Years of ERU issuance: 2012, 2013.

  • d) Reports: PDD; RF Letter of approval (in Russian); Switzerland Letter of approval (in English and Russian); Determination report (in Russian); Monitoring report for 01.01.2009-30.06.2011 (in Russian); Verification expert evaluation for 01.01.2009-30.06.2011 (in Russian); Monitoring report for 01.07.2011-31.12.2011 (in Russian); Verification expert evaluation for 01.07.2011-31.12.2011 (in Russian); Monitoring report for 01.01.2012-30.06.2012 (in Russian); Verification expert evaluation for 01.01.2012-30.06.2012 (in Russian); Monitoring report for 01.07.2012-30.09.2012 (in Russian); Verification expert evaluation for çà 01.07.2012-30.09.2012 (in Russian); Monitoring report for 01.10.2012-31.12.2012 (in Russian); Verification expert evaluation for 01.10.2012-31.12.2012 (in Russian).

    RU1000318

  • a) Project name: The implementation of energy efficiency measures at Chelyabinsk Electrometallurgical Works, OJSC

  • b) Project location: Chelyabinsk, the Russian Federation

  • c) Years of ERU issuance: 2012.

  • d) Reports: PDD; RF Letter of approval (in Russian); Switzerland Letter of approval (in English and Russian); Determination report; Monitoring report for 01.01.2008 - 31.12.2010 (in Russian); Verification expert evaluation for 01.01.2008 - 31.12.2010 (in Russian); Monitoring report for 01.01.2011 - 31.12.2011 (in Russian); Verification expert evaluation for 01.01.2011 - 31.12.2011 (in Russian).

    RU1000319

  • a) Project name: Associated petroleum gas recovery at Priobskoe oil field of Rosneft

  • b) Project location: Urals Federal District, Khanty-Mansiisky Autonomous District - Ugra, Priobskoe oil field

  • c) Years of ERU issuance: 2012, 2013.

  • d) Reports: PDD; RF Letter of approval (in Russian); Netherlands Letter of approval (in English and Russian); Determination report (in Russian); Monitoring report for 01.01.2008 - 31.12.2008 and 01.01.2010 - 31.12.2011 (in Russian); Verification expert evaluation for 01.01.2008 - 31.12.2008 and 01.01.2010 - 31.12.2011 (in Russian); Monitoring report for 01.01.2012 - 30.06.2012 (in Russian); Verification expert evaluation for 01.01.2012 - 30.06.2012 (in Russian); Monitoring report for 01.07.2012-30.11.2012 (in Russian); Verification expert evaluation for 01.07.2012-30.11.2012 (in Russian).

    RU1000322

  • a) Project name: Fuel switch at the Arkhangelskaya and Severodvinskaya combined heat-and-power plants of the JSC Territorial Generation Company # 2, Russian Federation

  • b) Project location: Arkhangelsk and Severodvinsk cities, Russian Federation

  • c) Years of ERU issuance: 2012.

  • d) Reports: PDD (in Russian); RF Letter of approval (in Russian); Switzerland Letter of approval (in English and Russian); Determination report (in Russian); Monitoring report for 19.01.2011 - 31.03.2012 (in Russian); Verification expert evaluation for 19.01.2011 - 31.03.2012 (in Russian); Monitoring report for 01.04.2012-30.09.2012 (in Russian); Verification expert evaluation for 01.04.2012-30.09.2012 (in Russian).

    RU1000323

  • a) Project name: The utilization of associated petroleum gas (APG) of the Sugmut oilfield JSC “Gazpromneft - Noyabrskneftegaz” taking into account the effective use of APG of the Romanovo oilfield

  • b) Project location: Pur district, Yamal-Nenets Autonomous Okrug (YNAO), Tyumen oblast, Russian Federation

  • c) Years of ERU issuance: 2012.

  • d) Reports: PDD; RF Letter of approval (in Russian); Switzerland Letter of approval (in English and Russian); Determination report; Monitoring report for 01.01.2008 - 31.12.2010 (in Russian); Verification expert evaluation for 01.01.2008 - 31.12.2010 (in Russian); Monitoring report for 01.01.2011 - 31.03.2012 (in Russian); Verification expert evaluation for 01.01.2011 - 31.03.2012 (in Russian).

    RU1000324

  • a) Project name: The utilization of associated petroleum gas of the Yarayner oilfield of JSC “Gazpromneft-Noyabrskneftegaz”

  • b) Project location: Pur district, Yamal-Nenets Autonomous Okrug (YNAO), Tyumen oblast, Russian Federation

  • c) Years of ERU issuance: 2012.

  • d) Reports: PDD; RF Letter of approval (in Russian); Switzerland Letter of approval (in English and Russian); Determination report; Monitoring report for 01.01.2008 - 31.12.2010 (in Russian); Verification expert evaluation for 01.01.2008 - 31.12.2010 (in Russian).

    RU1000325

  • a) Project name: Associated petroleum gas flaring reduction and electricity generation at the Khasyrey oil field

  • b) Project location: Nenets Autonomous Okug (Polar Urals), Arkhangelsk Oblast

  • c) Years of ERU issuance: 2012, 2013.

  • d) Reports: PDD; RF Letter of approval (in Russian); Netherlands Letter of approval (in English and Russian); Determination report (in Russian); Monitoring report for 01.01.2008-31.12.2008 (in Russian); Verification report for 01.01.2008-31.12.2008; Verification expert evaluation for 01.01.2008-31.12.2008 (in Russian); Monitoring report for 01.01.2009-31.12.2009 (in Russian); Verification report for 01.01.2009-31.12.2009; Verification expert evaluation for 01.01.2009-31.12.2009 (in Russian); Monitoring report for 01.01.2010-31.12.2010 (in Russian); Verification report for 01.01.2010-31.12.2010; ýVerification expert evaluation for 01.01.2010-31.12.2010 (in Russian); Monitoring report for 01.01.2011-31.12.2011 (in Russian); Verification report for 01.01.2011-31.12.2011; Verification expert evaluation for 01.01.2011-31.12.2011 (in Russian); Monitoring report for 01.01.2012-30.11.2012 (in Russian); Verification expert evaluation for 01.01.2012-30.11.2012 (in Russian); Monitoring report for 01.01.2012-30.11.2012 (in Russian); Verification expert evaluation for 01.01.2012-30.11.2012 (in Russian).

    RU1000332

  • a) Project name: Finger Shaft Furnace construction at OJSC Severstal, Cherepovets, Vologda region, Russian Federation

  • b) Project location: Vologda region, Cherepovets city

  • c) Years of ERU issuance: 2012.

  • d) Reports: PDD; RF Letter of approval (in Russian); Netherlands Letter of approval (in English and Russian); Determination report (in Russian); Monitoring report for 02.11.2008 - 31.12.2010 (in Russian); Verification expert evaluation for 02.11.2008 - 31.12.2010 (in Russian).

    RU1000333

  • a) Project name: Energy efficiency interventions at OJSC Mordovcement Komsomolskiy town, Republic of Mordovia, Russian Federation

  • b) Project location: Russian Federation, The republic of Mordovia, Chamzinskiy district, Komsomolskiy Town

  • c) Years of ERU issuance: 2012.

  • d) Reports: PDD; RF Letter of approval (in Russian); Netherlands Letter of approval (in English and Russian); Determination report; Monitoring report for 01.01.2008 - 31.12.2010 (in Russian); Verification expert evaluation for 01.01.2008 - 31.12.2010 (in Russian).

    RU1000334

  • a) Project name: Implementation of modern technologies of sinter production and blast furnaces charging at OJSC MMK

  • b) Project location: Magnitogorsk, Chelyabinsk Region, Russia

  • c) Years of ERU issuance: 2012.

  • d) Reports: PDD; RF Letter of approval (in Russian); Netherlands Letter of approval (in English and Russian); Determination report (in Russian); Monitoring report for 01.01.2009-31.12.2010; Verification report for 01.01.2009-31.12.2010; Verification expert evaluation for 01.01.2009-31.12.2010 (in Russian); Monitoring report for 01.01.2011-30.09.2012 (in Russian); Verification expert evaluation for 01.01.2011-30.09.2012 (in Russian).

    RU1000335

  • a) Project name: Production of continuously casted slab steel billet by arc-furnace technique at OJSC MMK

  • b) Project location: Magnitogorsk, Chelyabinsk Region, Russia

  • c) Years of ERU issuance: 2012.

  • d) Reports: PDD; RF Letter of approval (in Russian); Netherlands Letter of approval (in English and Russian); Determination report (in Russian); Monitoring report for 01.01.2008-31.12.2010; Verification report for 01.01.2008-31.12.2010; Verification expert evaluation for 01.01.2008-31.12.2010 (in Russian); Monitoring report for 01.01.2011-30.09.2012; Verification expert evaluation for 01.01.2011-30.09.2012 (in Russian).

    RU1000336

  • a) Project name: Modernization of OJSC “Solombala PPM” energy-generating facilities to reduce fossil fuel consumption, Arkhangelsk, Russian Federation

  • b) Project location: Russian Federation , Arkhangelsk Region, City of Arkhangelsk

  • c) Years of ERU issuance: 2012.

  • d) Reports: PDD; RF Letter of approval (in Russian); Switzerland Letter of approval; Determination report; Monitoring report for 01.01.2008-31.12.2010 (in Russian); Verification expert evaluation for 01.01.2008-31.12.2010 (in Russian).

    RU1000338

  • a) Project name: Technical re-equipment of Tyumen‘ CHPP-1 with putting into operation of a combined-cycle gas plant

  • b) Project location: City of Tyumen‘, Tyumen‘ Region, Russian Federation

  • c) Years of ERU issuance: 2012.

  • d) Reports: PDD; RF Letter of approval; Finland Letter of approval; Determination report (in Russian); Monitoring report for 01.01.2011 - 31.12.2011 (in Russian); Verification expert evaluation for 01.01.2011 - 31.12.2011 (in Russian); Monitoring report for 01.01.2012 - 30.09.2012; Verification expert evaluation for 01.01.2012 - 30.09.2012 (in Russian).

    RU1000339

  • a) Project name: Energy Efficiency Improvement in Revamping of Steel Production at Severstal JSC, Cherepovets, Russia. Iron production expanding.

  • b) Project location: Russian Federation, Vologda region, Cherepovets city

  • c) Years of ERU issuance: 2012.

  • d) Reports: PDD; RF Letter of approval (in Russian); Netherlands Letter of approval (in English and Russian); Determination report (in Russian); Monitoring report for 01.01.2008 - 31.12.2011 (in Russian); Verification expert evaluation for 01.01.2008 - 31.12.2011 (in Russian).

    RU1000340

  • a) Project name: Installation of three gas turbines SGT-800 type at GTES “Kolomenskoe”, Moscow, Russian Federation (ex. Installation of three combined cycle gas turbine SGT-800 at GTES “Kolomenskoe”, Moscow, Russian Federation.)

  • b) Project location: Moscow region, Moscow city.

  • c) Years of ERU issuance: 2012.

  • d) Reports: PDD; RF Letter of approval (in Russian); Netherlands Letter of approval (in English and Russian); Determination report (in Russian); Monitoring report for 26.05.2009 - 31.12.2011 (in Russian); Verification expert evaluation for 26.05.2009 - 31.12.2011 (in Russian).

    RU1000343

  • a) Project name: Utilization of associated petroleum gas from the Verkhnekamsk oil fields, «Permneftegazpererabotka» LLC, Perm, Russian Federation

  • b) Project location: Perm, Russian Federation

  • c) Years of ERU issuance: 2012.

  • d) Reports: PDD; RF Letter of approval (in Russian); Great Britain Letter of approval (in English and Russian); Determination report (in Russian); Monitoring report for 01.04.2011-31.12.2011 (in Russian); Verification expert evaluation for 01.04.2011-31.12.2011 (in Russian).

    RU1000344

  • a) Project name: Reconstruction of Pervomayskaia CHP -14 with installation of combined cycle units

  • b) Project location: St. Petersburg City,Leningrad region, the Russian Federation

  • c) Years of ERU issuance: 2012.

  • d) Reports: PDD; RF Letter of approval (in Russian); Finland Letter of approval (in English and Finnish); Determination report (in Russian); Monitoring report for 01.01.2011-31.12.2011 (in Russian); Verification expert evaluation for 01.01.2011-31.12.2011 (in Russian).

    RU1000345

  • a) Project name: Enhancement of Yuzhnaia CHP – 22 of St-Petersburg. Construction of unit ¹4

  • b) Project location: St. Petersburg City, Leningrad region, the Russian Federation

  • c) Years of ERU issuance: 2012.

  • d) Reports: PDD; RF Letter of approval (in Russian); Finland Letter of approval (in English and Finnish); Determination report (in Russian); Monitoring report for 01.04.2011-31.12.2011 (in Russian); Verification expert evaluation for 01.04.2011-31.12.2011 (in Russian).

    RU1000347

  • a) Project name: Construction of electric arc furnace shop with open heart furnace production decommissioning at OJSC “NSMMZ”, Revda, Russia

  • b) Project location: Sverdlovsk region, Revda city

  • c) Years of ERU issuance: 2012.

  • d) Reports: PDD; RF Letter of approval (in Russian); Netherlands Letter of approval ; Determination report; Monitoring report for 01.01.2008-31.12.2011 (in Russian); Verification expert evaluation for 01.01.2008-31.12.2011 (in Russian).

    RU1000349

  • a) Project name: Production modernisation at JSC Amurmetal, Komsomolsk-on-Amur, Khabarovsk Krai, Russian Federation

  • b) Project location: Khabarovsk Krai, Komsomolsk-on-Amur city

  • c) Years of ERU issuance: 2012.

  • d) Reports: PDD; RF Letter of approval (in Russian); Netherlands Letter of approval (in English and Russian); Determination report (in Russian); Monitoring report for 01.01.2008-31.12.2009 (in Russian); Verification expert evaluation for 01.01.2008-31.12.2009 (in Russian).

    RU1000351

  • a) Project name: Reduction of PFC emissions at Irkutsk aluminium smelter

  • b) Project location: City of Shelekhov, Irkutsk oblast, the Russian Federation

  • c) Years of ERU issuance: 2012, 2013.

  • d) Reports: PDD; RF Letter of approval (in Russian); Switzerland Letter of approval (in English and Russian); Determination report (in Russian); Monitoring report for 01.01.2008-31.03.2012 (in Russian); Verification expert evaluation for 01.01.2008-31.03.2012 (in Russian); Monitoring report for 01.04.2012-31.12.2012 (in Russian); Verification expert evaluation for 01.04.2012-31.12.2012 (in Russian).

    RU1000352

  • a) Project name: Reduction of PFC emissions at RUSAL Bratsk aluminium smelter

  • b) Project location: City of Bratsk, Irkutsk oblast, the Russian Federation

  • c) Years of ERU issuance: 2012, 2013.

  • d) Reports: PDD; RF Letter of approval (in Russian); Switzerland Letter of approval (in English and Russian); Determination report (in Russian); Monitoring report for 01.01.2008-31.03.2012 (in Russian); Verification expert evaluation for 01.01.2008-31.03.2012 (in Russian); Monitoring report for 01.04.2012-31.12.2012 (in Russian); Verification expert evaluation for 01.04.2012-31.12.2012 (in Russian).

    RU1000353

  • a) Project name: Utilization of associated petroleum gas at the fields of Companies of TNK-BP Group, Western Siberia

  • b) Project location: City of Bratsk, Irkutsk oblast, the Russian Federation

  • c) Years of ERU issuance: 2012, 2013.

  • d) Reports: PDD; RF Letter of approval (in Russian); Switzerland Letter of approval (in English and Russian); Determination report (in Russian); Changes in PDD (in Russian); Expert statement on changes in PDD (in Russian); Monitoring report for 01.01.2008-30.06.2012 (in Russian); Verification expert evaluation for 01.01.2008-30.06.2012 (in Russian).

    RU1000354

  • a) Project name: Gathering of associated petroleum gas at Khokhryakovskoye field

  • b) Project location: Nizhnevartovskiy district, Khanty-Mansiyskiy Autonomous Okrug (KhMAO) Tyumen oblast, the Russian Federation

  • c) Years of ERU issuance: 2012.

  • d) Reports: PDD; RF Letter of approval (in Russian); Switzerland Letter of approval (in English and Russian); Determination report (in Russian); Monitoring report for 01.01.2008-31.12.2011 (in Russian); Verification expert evaluation for 01.01.2008-31.12.2011 (in Russian).

    RU1000355

  • a) Project name: Reduction of PFC emissions at RUSAL Sayanogorsk aluminium smelter

  • b) Project location: City of Sayanogorsk, Khakassia region, the Russian Federation

  • c) Years of ERU issuance: 2012, 2013.

  • d) Reports: PDD; RF Letter of approval (in Russian); Switzerland Letter of approval (in English and Russian); Determination report (in Russian); Monitoring report for 01.01.2008-31.03.2012 (in Russian); Verification expert evaluation for 01.01.2008-31.03.2012 (in Russian); Monitoring report for 01.04.2012-31.12.2012 (in Russian); Verification expert evaluation for 01.04.2012-31.12.2012 (in Russian).

    RU1000356

  • a) Project name: Energy Efficiency measures at OJSC “Metallurgical plant named after A.K. Serov” UMMC Company

  • b) Project location: Sverdlovsk Area, Ural region, the Russian Federation

  • c) Years of ERU issuance: 2012.

  • d) Reports: PDD; RF Letter of approval (in Russian); Switzerland Letter of approval; Determination report; Monitoring report for 01.01.2008 - 31.12.2011 (in Russian); Verification expert evaluation for 01.01.2008 - 31.12.2011 (in Russian).

    RU1000357

  • a) Project name: Reduction of PFC emissions at RUSAL Novokuznetsk aluminium smelter

  • b) Project location: City of Novokuznetsk, Kemerovo Region, the Russian Federation

  • c) Years of ERU issuance: 2012, 2013.

  • d) Reports: PDD; RF Letter of approval (in Russian); Switzerland Letter of approval (in English and Russian); Determination report (in Russian); Monitoring report for 01.01.2008-31.03.2012 (in Russian); Verification expert evaluation for 01.01.2008-31.03.2012 (in Russian); Monitoring report for 01.04.2012-31.12.2012 (in Russian); Verification expert evaluation for 01.04.2012-31.12.2012 (in Russian).

    RU1000358

  • a) Project name: «Installation of a multi-fuel boiler at CJSC “International Paper” (former Svetogorsk PPM) for waste biomass utilization and energy generation for own needs, Svetogorsk, Russia»

  • b) Project location: Russian Federation , Svetogorsk

  • c) Years of ERU issuance: 2012.

  • d) Reports: PDD; RF Letter of approval (in Russian and French); France Letter of approval; Determination report; Monitoring report for 01.01.2008-31.12.2011 (in Russian); Verification expert evaluation for 01.01.2008-31.12.2011 (in Russian).

    RU1000359

  • a) Project name: Bark and wood wastes to heat at OJSC “Solombala Sawmill and Woodworking Plant”, Arkhangelsk, Russian Federation

  • b) Project location: Russian Federation, Arkhangelsk

  • c) Years of ERU issuance: 2012.

  • d) Reports: PDD; RF Letter of approval (in Russian); Switzerland Letter of approval; Determination report; Monitoring report for 01.01.2008-31.12.2010 (in Russian); Verification expert evaluation for 01.01.2008-31.12.2010 (in Russian).

    RU1000361

  • a) Project name: Energy efficiency improvement under reconstruction of Oxygen shop and steel continuous casting section of Blast Oxygen Furnace shop #2 at OJSC “Novolipetsk Steel”

  • b) Project location: Lipetsk town in the Lipetsk area, Russian Federation

  • c) Years of ERU issuance: 2012.

  • d) Reports: PDD; RF Letter of approval (in Russian); Netherlands Letter of approval; Determination report (in Russian); Monitoring report for 01.01.2008-31.12.2011 (in Russian); Verification expert evaluation for 01.01.2008-31.12.2011 (in Russian).

    RU1000364

  • a) Project name: New dry cement line installation at OJSC “Sukholozhskcement”, Sverdlovsk area, Russia

  • b) Project location: Sverdlovsk area, Sukhoy-Log city , Russian Federation

  • c) Years of ERU issuance: 2012.

  • d) Reports: PDD; RF Letter of approval (in Russian); Netherlands Letter of approval; Determination report; Monitoring report for 18.11.2010-31.05.2012 (in Russian); Verification expert evaluation for 18.11.2010-31.05.2012 (in Russian).

    RU1000366

  • a) Project name: «Waste Biomass Utilization at JSC Arkhangelsk Pulp and Paper Mill (APPM), Arkhangelsk region, Russia»

  • b) Project location: Russian Federation , Arkhangelsk region

  • c) Years of ERU issuance: 2012.

  • d) Reports: PDD; RF Letter of approval (in Russian); UK Letter of approval; Determination report; Monitoring report for 01.01.2008-31.12.2010 (in Russian); Verification expert evaluation for 01.01.2008-31.12.2010 (in Russian); Monitoring report for 01.01.2011-31.12.2011 (in Russian); Verification expert evaluation for 01.01.2011-31.12.2011 (in Russian).

    RU1000367

  • a) Project name: Implementation of steam-gas turbine units at the CHP of JSC “Mosenergo”, Russia

  • b) Project location: City of Moscow, Moscow region, the Russian Federation

  • c) Years of ERU issuance: 2012, 2013.

  • d) Reports: PDD; RF Letter of approval (in Russian); Switzerland Letter of approval (in English and Russian); Determination report (in Russian); Monitoring report for 01.01.2008-31.03.2012 (in Russian); Verification expert evaluation for 01.01.2008-31.03.2012 (in Russian); Monitoring report for 01.04.2012-30.09.2012 (in Russian); Verification expert evaluation for 01.04.2012-30.09.2012 (in Russian); Monitoring report for 01.10.2012-31.12.2012 (in Russian); Verification expert evaluation for 01.10.2012-31.12.2012 (in Russian).

    RU1000370

  • a) Project name: Reconstruction of the metallurgical plant at the Chelyabinsk Metallurgical Plant ???, Chelyabinsk, Russia

  • b) Project location: Chelyabinsk region, the Russian Federation

  • c) Years of ERU issuance: 2012.

  • d) Reports: PDD; RF Letter of approval (in Russian); Switzerland Letter of approval; Determination report (in Russian); Monitoring report for 01.01.2008-31.12.2011 (in Russian); Verification expert evaluation for 01.01.2008-31.12.2011 (in Russian); Monitoring report for 01.01.2012-30.09.2012 (in Russian); Verification expert evaluation for 01.01.2012-30.09.2012 (in Russian).

    RU1000371

  • a) Project name: Reconstruction of the steelmaking plant at the Izhstal OAO, Izhevsk, Russia

  • b) Project location: City of Izhevsk, Udmurt Republic, the Russian Federation

  • c) Years of ERU issuance: 2012.

  • d) Reports: PDD; RF Letter of approval (in Russian); Switzerland Letter of approval; Determination report (in Russian); Monitoring report for 29.10.2010-31.12.2011 (in Russian); Verification expert evaluation for 29.10.2010-31.12.2011 (in Russian); Monitoring report for 01.01.2012-30.09.2012 (in Russian); Verification expert evaluation for 01.01.2012-30.09.2012 (in Russian).

    RU1000372

  • a) Project name: Technical re-equipment of Chelyabinsk CHPP-3 with putting into operation of a combined-cycle gas plant

  • b) Project location: Russian Federation, Chelyabinsk Region, City of Chelyabinsk

  • c) Years of ERU issuance: 2012.

  • d) Reports: PDD ; RF Letter of approval (in Russian); Finland Letter of approval; Determination report; Monitoring report for 19.05.2012 - 30.06.2012; Verification expert evaluation for 19.05.2012 - 30.06.2012; Monitoring report for 01.07.2012 - 30.09-2012; Verification expert evaluation for 01.07.2012 - 30.09-2012 (in Russian).

    RU1000374

  • a) Project name: Retrofitting of Khabarovsk Power Plant

  • b) Project location: Khabarovsk city, Khabarovsk region, Russian Federation.

  • c) Years of ERU issuance: 2012.

  • d) Reports: PDD; RF Letter of approval (in Russian); Great Britain Letter of approval (in English and Russian); Determination report (in Russian); Monitoring report for 01.01.2008-31.12.2011 (in Russian); Verification expert evaluation for 01.01.2008-31.12.2011 (in Russian).

    RU1000382

  • a) Project name: Reconstruction of the Nevsky branch Hydro Power Plants

  • b) Project location: Svetogorsk town, Leningrad region, Russian Federation

  • c) Years of ERU issuance: 2012.

  • d) Reports: PDD; RF Letter of approval (in Russian ang English); Finland Letter of approval (in English and Finnish); Determination report (in Russian); Monitoring report for 02.06.2009-31.12.2011 (in Russian); Verification expert evaluation for 02.06.2009-31.12.2010 (in Russian); Verification expert evaluation for 01.01.2011-31.12.2011 (in Russian).

    RU1000383

  • a) Project name: Heating mains losses decline in settlements of Tuva Republic, Russian Federation

  • b) Project location: Tuva Republic, the Russian Federation

  • c) Years of ERU issuance: 2012.

  • d) Reports: PDD; RF Letter of approval (in Russian); Switzerland Letter of approval (in English and Russian); Determination report (in Russian); Monitoring report for 01.01.2008-31.03.2012 (in Russian); Verification expert evaluation for 01.01.2008-31.03.2012 (in Russian).

    RU1000387

  • a) Project name: Installation of two CCGT-400 at Surgutskaya TPP-2, OGK-4, Tyumen area, Russia

  • b) Project location: Surgut town, Tyumen area, Khanty-Mansiysk Autonomous district

  • c) Years of ERU issuance: 2012.

  • d) Reports: PDD; RF Letter of approval (in Russian); Germany Letter of approval; Determination report (in Russian); Monitoring report for 22.04.2011 - 31.12.2011 (in Russian); Verification expert evaluation for 22.04.2011 - 31.12.2011 (in Russian).

    RU1000390

  • a) Project name: Switch from wet to dry process at OJSC “Shchurovsky Cement”, Russia

  • b) Project location: Kolomna, Moscow area, Russian Federation

  • c) Years of ERU issuance:

  • d) Reports: PDD; RF Letter of approval (in Russian); Letter of approval of Netherland; Determination report (in Russian).

    RU1000394

  • a) Project name: Heating mains losses decline in settlements of Tuva Republic, Russian Federation

  • b) Project location: Tuva Republic, Russian Federation

  • c) Years of ERU issuance: 2012.

  • d) Reports: PDD; RF Letter of approval (in Russian); Germany Letter of approval; Determination report (in Russian); Monitoring report for 12.06.2011-31.12.2011 (in Russian); Verification expert evaluation for 12.06.2011-31.12.2011 (in Russian).

    RU1000395

  • a) Project name: Utilization of associated petroleum gas at the fields of Companies of TNK-BP Group, Orenburg oblast

  • b) Project location: Orenburg region, Russian Federation

  • c) Years of ERU issuance: 2012.

  • d) Reports: PDD; RF Letter of approval (in Russian); Switzerland Letter of approval (in English and Russian); Determination report (in Russian); Monitoring report for 01.01.2008-31.12.2011 (in Russian); Verification expert evaluation for 01.01.2008-31.12.2011 (in Russian).

    RU1000397

  • a) Project name: Blast Furnace reconstruction at OJSC KMZ, Tula, Tula Region, Russian Federation

  • b) Project location: Tula Region, Tula city

  • c) Years of ERU issuance:

  • d) Reports: PDD; RF Letter of approval (in Russian); Letter of approval of Netherland; Determination report (in Russian).

    RU1000398

  • a) Project name: Associated petroleum gas utilization at the Urengoy oil-gas condensate field, Russian Federation

  • b) Project location: Pur district, Yamal-Nenets Autonomous Okrug (YNAO), Tyumen oblast, Russian Federation

  • c) Years of ERU issuance: 2012.

  • d) Reports: PDD; RF Letter of approval (in Russian); Great Britain Letter of approval(in English and Russian); Determination report (in Russian); Monitoring report for 01.05.2012-31.05.2012 (in Russian); Verification expert evaluation for 01.05.2012-31.05.2012 (in Russian).

    RU1000409

  • a) Project name: Wood waste-to-energy project at Sawmill-25

  • b) Project location: Arkhangelsk, Arkhangelsk Region, Russian Federation

  • c) Years of ERU issuance: 2012.

  • d) Reports: PDD; RF Letter of approval (in Russian); Letter of approval of Netherland (in English and Russian); Determination report ; Monitoring report for 01.01.2008-31.12.2010; Verification expert evaluation for 01.01.2008-31.12.2010 (in Russian).

    RU1000410

  • a) Project name: Implementation of 800 MW power generating unit No.2 at Nizhnevartovskaya GRES

  • b) Project location: Nizhnevartovsk city, Russian Federation

  • c) Years of ERU issuance: 2012.

  • d) Reports: PDD; RF Letter of approval (in Russian); Switzerland Letter of approval (in English and Russian); Determination report (in Russian); Monitoring report for 01.01.2008-31.12.2011 (in Russian); Verification expert evaluation for 01.01.2008-31.12.2011 (in Russian).

    RU1000412

  • a) Project name: Expansion of Krasnodar CHPP with installation of CCP-410, LLC “LUKOIL-Kubanenergo”,Russian Federation

  • b) Project location: Russian Federation, Krasnodar

  • c) Years of ERU issuance:

  • d) Reports: PDD; RF Letter of approval (in Russian); Great Britain Letter of approval; Determination report (in Russian).

    RU1000413

  • a) Project name: Introduction of energy-saving measures with utilization of biomass for production of energy resources at the business units of LLC “MEZ Yug Rusi”

  • b) Project location: Krasnodar and Voronezh regions, the Russian Federation

  • c) Years of ERU issuance: 2012.

  • d) Reports: PDD; RF Letter of approval (in Russian); Switzerland Letter of approval (in English and Russian); Determination report (in Russian); Monitoring report for 01.01.2008-30.06.2012 (in Russian); Verification expert evaluation for 01.01.2008-30.06.2012 (in Russian).

    RU1000431

  • a) Project name: Construction of gas piston power plants for utilization of associated petroleum gas at oilfields developed by OJSC “Surgutneftegas” in Khanty-Mansiysk Autonomous Okrug

  • b) Project location: Russian Federation, Tyumen Region, Khanty-Mansiysk Autonomous Okrug

  • c) Years of ERU issuance: 2012, 2013.

  • d) Reports: PDD; RF Letter of approval (in Russian); Great Britain Letter of approval (in English and Russian); Determination report (in Russian); Monitoring report for 01.01.2008-31.05.2012 (in Russian); Verification expert evaluation for 01.01.2008-31.05.2012 (in Russian); Monitoring report for 01.01.2008-31.05.2012 (in Russian); Verification expert evaluation for 01.06.2012-31.12.2012 (in Russian).

    RU1000432

  • a) Project name: Reconstruction of Astrakhan TPP through construction of CCP-110, LLC “LUKOIL-Astrakhanenergo”, Russian Federation

  • b) Project location: Russian Federation, Astrakhan

  • c) Years of ERU issuance:

  • d) Reports: PDD; RF Letter of approval (in Russian); Great Britain Letter of approval; Determination report (in Russian).

    RU1000434

  • a) Project name: Efficient utilization of associated petroleum gas at Salym oilfields, Tumen oblast, Russian Federation

  • b) Project location: Nefteyuganskiy region, Khanty-Mansiyskiy Autonomous Okrug (KhMAO), Tyumen oblast, the Russian Federation

  • c) Years of ERU issuance: 2012.

  • d) Reports: PDD; RF Letter of approval (in Russian); Switzerland Letter of approval (in English and Russian); Determination report; Monitoring report for 09.01.2008-30.09.2012 (in Russian); Verification expert evaluation for 09.01.2008-30.09.2012 (in Russian).

    RU1000449

  • a) Project name: Installation of CCGT unit at the Dzerzhinskaya HPS, Russian Federation

  • b) Project location: City of Dzerzhinsk, Novgorod region, the Russian Federation

  • c) Years of ERU issuance: 2012.

  • d) Reports: PDD; RF Letter of approval (in Russian); Switzerland Letter of approval; Determination report (in Russian); Monitoring report for 01.01.2008-31.12.2011 (in Russian); Verification expert evaluation for 01.01.2008-31.12.2011 (in Russian).

    RU1000451

  • a) Project name: Construction of new energy unit at Novosibirsk HPS 5

  • b) Project location: the city of Novosibirsk, Novosibirsk region, Russian Federation

  • c) Years of ERU issuance: 2012.

  • d) Reports: PDD; RF Letter of approval (in Russian); Great Britain Letter of approval (in English and Russian); Determination report (in Russian); Monitoring report for 01.01.2008-31.05.2012 (in Russian); Verification expert evaluation for 01.01.2008-31.05.2012 (in Russian).

    RU1000455

  • a) Project name: Utilization of associated petroleum gas on Talakan oil and gas condensate field, Russian Federation

  • b) Project location: The Russian Federation, Sakha (Yakutia) Republic

  • c) Years of ERU issuance: 2012, 2013.

  • d) Reports: PDD; RF Letter of approval (in Russian); Great Britain Letter of approval (in English and Russian); Determination report (in Russian); Monitoring report for 02.01.2010-30.04.2012 (in Russian); Verification expert evaluation for 02.01.2010-30.04.2012 (in Russian); Monitoring report for 02.01.2010-30.04.2012 (in Russian); Verification expert evaluation for 02.01.2010-30.04.2012 (in Russian); Monitoring report for 01.05.2012-31.12.2012 (in Russian); Verification expert evaluation for 01.05.2012-31.12.2012 (in Russian).

    RU1000462

  • a) Project name: Pellet Production from Sawmill Wastes at CJSC-Sawmill 25, Arkhangelsk, the Russian Federation

  • b) Project location: Russian Federation, Arkhangelsk

  • c) Years of ERU issuance: 2013.

  • d) Reports: PDD; RF Letter of approval (in Russian); Great Britain Letter of approval (in English and Russian); Determination report (in Russian); Monitoring report for 21.05.2008-31.12.2012 (in Russian); Verification expert evaluation for 21.05.2008-31.12.2012 (in Russian).

    RU1000471

  • a) Project name: Waste Coke Oven Gas Utilization at OOO PO "Khimprom"

  • b) Project location: Kemerovo City, Russia

  • c) Years of ERU issuance: 2013.

  • d) Reports: PDD; RF Letter of approval (in Russian); Sweden Letter of approval; Determination report; Monitoring report for 01.01.2008-30.06.2012 (in Russian); Verification expert evaluation for 01.01.2008-30.06.2012 (in Russian); Monitoring report for 01.07.2012-31.12.2012 (in Russian); Verification expert evaluation for 01.07.2012-31.12.2012 (in Russian).

    RU1000484

  • a) Project name: Construction of new Air Separation Plant by Air Liquide Severstal, Russia

  • b) Project location: Cherepovets town in the Vologda region of the Russian Federation

  • c) Years of ERU issuance: 2012.

  • d) Reports: PDD; RF Letter of approval (in Russian); Letter of approval of Netherland; Determination report (in Russian); Monitoring report for 01.01.2008-31.07.2012; Verification expert evaluation for 01.01.2008-31.07.2012 (in Russian).

    RU1000487

  • a) Project name: Carbon sequestration via afforestation in Siberian settlements, Russian Federation

  • b) Project location: Altai Kray, Siberia, the Russian Federation

  • c) Years of ERU issuance: 2013, 2014.

  • d) Reports: PDD; RF Letter of approval (in Russian); Lithuania Letter of approval (in English and Russian); Determination report (in Russian); Changes in PDD (in Russian); Expert statement on changes in PDD (in Russian); Monitoring report for 01.01.2008-30.06.2012 (in Russian); Verification expert evaluation for 01.01.2008-30.06.2012 (in Russian).

    RU1000488

  • a) Project name: Increase in efficiency of heating supply system of Novo-Lenino district, the Irkutsk city, Irkutsk region, Russian Federation

  • b) Project location: Irkutsk city, Irkutsk region, Russian Federation

  • c) Years of ERU issuance: 2012.

  • d) Reports: PDD; RF Letter of approval (in Russian); Great Britain Letter of approval; Determination report (in Russian); Monitoring report for 01.12.2008-31.05.2012 (in Russian); Verification expert evaluation for 01.12.2008-31.05.2012 (in Russian).

    RU1000496

  • a) Project name: GHG emission reduction through the commissioning of biogas-fuelled mini- HPPs at the Kurianovo and Lyubertsy waste water treatment facilities of the MGUP Mosvodokanal

  • b) Project location: Moscow, Russian Federation

  • c) Years of ERU issuance: 2013.

  • d) Reports: PDD; RF Letter of approval (in Russian); Sweden Letter of approval(in Englisn and Russian); Determination report (in Russian); Monitoring report for 01.03.2009-31.12.2012 (in Russian); Verification expert evaluation for 01.03.2009-31.12.2012 (in Russian).

    RU2000050

  • a) Project name: Bikin Tiger Carbon Project - Permanent protection of otherwise logged Bikin Forest, in Primorye Russia

  • b) Project location: Primorsky Krai, Russian Federation

  • c) Years of ERU issuance: 2013.

  • d) Reports: PDD; RF Letter of approval (in Russian); France Letter of approval(in French and English); Modalities of communication; Determination report; Determination report; Monitoring report for 03.06.2009-31.10.2012; Verification expert evaluation for 03.06.2009-31.10.2012; Verification expert evaluation for 03.06.2009-31.10.2012.